How long will my 3D printing order take?
Updated
On this page
- Lead times at a glance
- From quote to collection: the clock starts when you pay
- Size: large parts take longer
- Paint and plating: about 12 to 18 working days in all
- Quantity: larger runs take longer but cost less per part
- Express and Super Rush: for when the date is fixed
- How to get your order sooner: clean files and a quick yes
- Frequently asked
A plain 3D print in FDM or SLA takes 4 to 7 working days on the Standard queue, or 1 to 3 working days on Super Rush. Painting or plating one to three parts brings it to about 12 to 18 working days, and the tables below give the time for every process and service we offer. These times are a rough gauge: the real date depends on our production queue, but they are what we usually meet.
Lead times at a glance
For 3D printing:
| Process and what it is | Plain print, Standard queue | Express or Super Rush |
|---|---|---|
| FDM: plastic filament printed layer by layer, our everyday process | 4 to 7 working days | Express 3 to 5 working days, Super Rush 1 to 3 |
| SLA: liquid resin hardened by light, for fine detail and smooth faces | 4 to 7 working days | Express 3 to 5 working days, Super Rush 1 to 3 |
| SLS: nylon powder fused by a laser, for strong working parts | 8 to 12 working days | Available too: ask us for the days |
| MJF: nylon powder fused in one pass, a little smoother than SLS | 12 to 15 working days | Available too: ask us for the days |
| SLM metal: metal powder melted by a laser, for steel, aluminium or titanium | 10 to 12 working days | Available too: ask us for the days |
Painted or plated: one to three painted or electroplated parts typically take about 12 to 18 working days in all, print and our final quality check included, depending on their size, how complex the finish is and whether a colour has to be matched. For 4 to 14 parts, ask us for a date. A batch of 15 or more takes at least 15 working days painted, or 18 plated, and often longer, so ask us for a date. For SLS, MJF and metal parts, the finishing comes on top of the print times above, and we confirm the date with your quote.
For moulding, signs and crystal:
| Service and what it is | How long it takes |
|---|---|
| Vacuum casting: copies cast in a silicone mould taken from a printed master, 20 to 50 casts per mould | About 1 week for the master, 2 to 3 working days for the mould, then 7 to 10 working days of casting |
| Injection moulding: plastic shot into a machined tool, for runs of thousands | About 7 weeks for a steel tool, then 3 to 4 weeks of production; an aluminium tool is also possible |
| Signage: signs designed and made to order | About 7 to 10 working days of design, then about 5 to 10 working days to make |
| Crystal awards: engraved or printed crystal | 10 to 15 working days once the design is confirmed |
Moulds and crystal awards are not in the instant quote: our team quotes them, so send your date with the request. Acrylic signs get an instant price in our sign studio. Need any of these sooner? We can often speed them up: send us your date before you order and we plan the job around it.
A general guide: every figure here is for a simple design with a low level of complexity, in a normal-size part up to about 10 to 15 cm across. Large or complex parts take longer, large SLA parts especially, so ask us for an accurate date.
When the clock starts: when you confirm and pay, counted in working days (Monday to Friday).
From quote to collection: the clock starts when you pay
A price comes back within 24 hours, usually the same business day. For a 3D file, the instant quote prices it in seconds with no email needed, and its Speed step is where you pick the Standard, Express or Super Rush queue. See how the instant quote works for the full walkthrough.
After you pay, a person checks every file. If a part cannot print as uploaded, or needs an adjustment, we contact you before printing. When it is done, collect it from our studio at 994 BENDEMEER ROAD, #07-06, B CENTRAL, SINGAPORE 339943 (Monday to Friday, 10:00 to 18:00), or have it couriered anywhere in Singapore.
Size: large parts take longer
The table assumes a part that fits in your hand. A big part spends more hours on the printer, and anything too big for one print is made in pieces and joined, which adds days. Large resin (SLA) parts are slower again, because each one prints, washes and cures slowly. For anything much over 15 cm across, send the file and ask us for the timing.

Paint and plating: about 12 to 18 working days in all
A raw print is quick. Paint and metal plating add days for sanding, priming, coats and curing. One to three painted or electroplated parts take about 12 to 18 working days in all, print included. For 4 to 14 parts, ask us for a date. A batch of 15 or more takes at least 15 working days painted, or 18 plated, and often longer, so ask us for a date. Where in that range your order lands depends on the part’s size, how detailed the finish is and whether a colour has to be matched.

Quantity: larger runs take longer but cost less per part
One part prints once. Fifty of the same part fill several printers and then go through finishing one by one, so a larger run takes longer. It also earns a volume discount, listed in our pricing guide. For hundreds of identical parts, a silicone mould or an injection mould tool can work out better, and the second table above shows how long each takes.

Express and Super Rush: for when the date is fixed
Express and Super Rush exist for every 3D printing process, and you choose the queue at checkout. For a plain FDM or SLA part, Express takes 3 to 5 working days and Super Rush 1 to 3. SLS, MJF and metal run on different days, so ask us for those, and the same goes for a painted or plated piece on a deadline. We have turned trophies around in 48 hours when there was no other option. Moulds, signs and crystal can also be sped up, by arrangement rather than a queue at checkout, so send us your date. If your date is tight, tell us before you pay and we plan the job around it.
How to get your order sooner: clean files and a quick yes
You can save days without paying for Super Rush:
- Send a print-ready file. A watertight STL or STEP skips the repair step. Our guide to preparing 3D files for printing shows what to check.
- Confirm the same day. A quote left unconfirmed for three days is an order that finishes three days later.
- Keep the finish simple. A plain or primed part is ready much sooner than a painted or plated one. We can print it first and paint it as a later order.
- Give the date early. Tell us the deadline when you ask for the price, and we plan the job around it.
Frequently asked
How long does a 3D printing order take in Singapore?
A plain FDM or SLA print of a normal-size part takes 4 to 7 working days on Standard, 3 to 5 on Express and 1 to 3 on Super Rush. SLS nylon takes about 8 to 12 working days, MJF nylon 12 to 15 and SLM metal 10 to 12. These are a rough guide for a part up to about 10 to 15 cm across; larger parts take longer, so check with us.
How long does a painted or plated 3D print take?
One to three painted or electroplated parts take about 12 to 18 working days in all, print included. For 4 to 14 parts, ask us for a date. A batch of 15 or more takes at least 15 working days painted, or 18 plated, and often longer, so ask us for a date. The time depends on the part's size, how detailed the finish is and whether a colour has to be matched.
Can you 3D print the same day?
Our fastest queue, Super Rush, takes 1 to 3 working days for a plain FDM or SLA part. Need it sooner? Message us before you order and we plan around your date.
Is there an Express or Super Rush option for SLS, MJF and metal?
Yes, Express and Super Rush exist for every 3D printing process, but SLS, MJF and metal do not run on the same days as FDM and SLA. Tell us your date and the part, and we confirm the fastest timing before you pay.
When does the lead time start?
The lead time starts when you confirm and pay for the order, not when you first ask for a price. A quote comes back within 24 hours, usually the same business day, and the instant quote prices a 3D file in seconds, so confirming quickly is the easiest way to get the part sooner.
How long do vacuum casting and injection moulding take?
Vacuum casting takes about 1 week for the master, 2 to 3 working days for the silicone mould, then 7 to 10 working days of casting, and one mould gives 20 to 50 casts. Injection moulding takes about 7 weeks for a steel tool, then 3 to 4 weeks of production. These are rough times, so check with us for your part.
Do larger orders get a discount?
Yes, larger runs of the same part are discounted, and our pricing guide lists the current rates. A larger run also takes longer to print and finish, so tell us the quantity and the date together.