Additive Inn
Get instant quote

Data centre energy scale model for BMC

BMC wanted its green initiative told in one model: a data centre on coal power on one side, on sun and wind on the other.

Client
BMC
What BMC brought
Its own first design, which we refined
Effects
Changing lights, a glowing cooling tower and chimney mist
Sides on one base, for today's power and tomorrow's
2
Fans in the lit cooling panel over today's data centre
6
Wind turbines on the future side
6
Fabrication time, after design approval
8 to 10 weeks

What we brought

  1. What we can do

    We build your whole story into one model

    A coal-fired power station on one side; solar panels, wind turbines and a roof park on the other.

  2. How we look after you

    We build on your design and keep it growing

    We add features and propose effects on top of your own design.

  3. What you get

    Your message lights up and moves

    Level lights, a colour-changing data centre, a red-lit fan panel and chimney mist make the comparison clear at a glance.

The build

How we built it

5 steps, from the brief to the finished piece. Pick a step to jump to it.

The brief

Step 1 of 5

At Additive Inn, our 3D printing studio in Singapore, we built BMC a two-sided scale model comparing a data centre's power today with a greener future. BMC wanted its existing design made more detailed and eye-catching.

The future side, run on sun and wind.

Design & fitment

Step 2 of 5

We built on BMC's design with extra features and a refined layout, and drew both sides in 3D. We proposed the chimney mist and the glow inside the cooling tower, and BMC approved both.

RenderThe future side, as drawn.
RenderToday's side, with racks under the fan panel.
RenderBoth sides, back to back across a wall.
RenderThe roof park's rolling levels, as drawn.

Fabrication

Step 3 of 5

We 3D printed the power station, chimneys, wind turbines, buildings and server racks. The cooling panel over today's data centre was made as its own unit: six fans behind metal grilles, each set in a printed frame.

Fans going into their printed frames.
The six-fan panel, assembled.

Build and assembly

Step 4 of 5

We lit the fan panel red, fitted colour lighting in both data centres and the cooling tower, and set the mist in the chimneys. Clear acrylic cases went over both data centres, with scenic grass, model trees and picture backdrops around them.

The panel lit red on the bench.

The final build

Step 5 of 5

The finished model, lit and running on both sides.

Today's side, powered by the coal-fired station.

How it works

Here is the finished model with its lights and effects running.

Mist rises from the chimneys like smoke.
The future data centre changes colour.

The details

Each side holds up both close up and from across the room.

A building wrapped in plants.
A park on the data centre roof.
Circuit-patterned panels, glowing blue.
Transformers, pylons and the glowing cooling tower.

More scale models

See all scale models →
Chat with us